TZPR Bridge Re-Opens 6-30-22!
Enroute to the downtown library this afternoon, I took a slight detour to check on the Tazewell & Peoria Railroad bridge. It had been lowered. Good news. Forty days is a long time to be without this bridge. After leaving the library, I checked again and noticed a BNSF coal train sitting on the main at Darst Street. Shortly, I heard the crew radio the St. Albans dispatcher for instruction. He informed them that the bridge was open. Unfortunately, a derail wouldn't respond and a maintainer had to drive out to fix it. It took 1.5 hours for the coal train to finally begin moving across the river. I no one is offended that I didn't shoot the whole train. At 5 mph, that would have taken 15 minutes! - David P. Jordan