Union Pacific CGMBV 12-27-24
I left work early when I learned that Union Pacific was running a loaded, northbound coal train on the Peoria Sub!
And when it appeared nothing was running smoothly, I wonder if I could have seen this train anyway had a I not left work early.
The first delay was a GFL garbage truck hitting the truss bridge over Rt. 29 at Pekin. Union Pacific had to send out someone to inspect the bridge for damage. Fortunately, there was no damage to the track structure, and the train was cleared to depart South Pekin.
Next, soggy weather and wet rails are a problem for loaded, northbound coal trains, but distributed power assisted the train's attack up Pioneer Hill, preventing a stall.
CAPTION: Union Pacific train CGMBV (Coal, Gateway Mine IL to Beverly IA) rolls by W. Farmington Road mid-afternoon Friday, December 27, 2024. Later, after fighting Pioneer Hill, the train runs past Akron Services Inc. at Akron. UP 7891 and UP 6198 on the point, 134 coal loads and UP 6246 as DPU.
- David P. Jordan
Comments
Post a Comment